Contact: Tony Zhang
Tel: +86-577-85951908
Fax: +86-577-86457291
E-Mail: [email protected]
Brand | FEIYOU |
Certificate | ISO14001、ISO18000、ISO9001、TUV |
Item number | FY210-02 |
Modules | Roofs, twin slide, S slide, tube , plastic panels, Stairs, decks, posts, climber, |
Product Size | 971*856*540cm |
Materials | a. Plastic parts: UV Resistant LLDPE b. Post: Galvanized steel pipe c. Metal: Galvanized steel d. Decks, stairs:steel with plastic covered e. Fasteners: 304 stainless steel f. Roof: Aluminum alloy (Different materials are available at your demand) |
Advantage | a. Anti-UV b. Anti-static c. Security d. Environmental protection e.Color is not easy to fade |
Installation | 24hours (5 persons) |
Falling Height(cm) | 158 cm |
Capacity | 15-30 |
Apply to | Amusement parks, kindergartens, nursery centers, parks, residential areas |
Delivery time | 10 days after received first payment |
Warranty | 3 years for plastic & metal parts |
Remark | 1.Please check the screws and other catchers regularly to ensure that the structure is firm. 2. Please ensure that all children play under adult supervision. 3. Blunt objects and acidic corrosive liquids are forbidden. |
▍Why choose us?
1.We are manufacturer with more than 30 years of history. We has an overall quality R&D, design, production, sales and service management team.
2.The products have passed ISO, TUV and other certifications, and the raw materials have passed the SGS test, which is safe and environmentally friendly.
▍Our services
1. Before shipping, we will strictly check each component to ensure there is no problem.
2.We have an excellent after-sales service and we are keen to establish a long-term and stable cooperative relationship with our customers.
▍Product advantages
1.Long warranty period, 2 years for metal parts and 3 years for plastic parts.
2. Plastic parts: Bright colors, anti-ultraviolet (UV) ability to 8, strong anti-static ability, safety and environment protection, weather resistant and high strength.
▍Material details
1. The plastic material is made of imported engineering plastics from Matrix, which is resistant to ageing and maintain colour and gloss.
2. The surface of the steel pipe parts is treated with corrosion-resistant galvanization.
3.All metal pipes are Hot Dipped Galvanized Pipes conforming to GB/T 13793-2008 with thickness of 2.5mm.
▍FAQ
Q1: Where is your factory located?
We’re located in Wenzhou, Zhejiang, China.
It will take 1 hour from Shanghai to Wenzhou by flight.
It will take 2 hours from Guangzhou to Wenzhou by flight.
Q2:what is the payment term and delivery time?
T/T, Trade Assurance in Alibaba: 50% as deposit before production, 50% as balance before loading the container.
For order more than 50,000.00$, we accept L/C.
For trial orders, we accept western union, paypal or cash.
Delivery time: 15 days for 1*40HQ, 10 days for 1*20GP.
+86-13566236059
#16 Chuangqiang Road, Light industrial area, Lucheng district, Wenzhou city, Zhejiang Province, China.
+86-577-85951908
+86-577-86457291